??博狗体育中文??

Xinhe County Kaishu Machinery Co., Ltd.
Product Sorts
Screw gate hoist series Hoist gate hoist series Cast iron gate series Steel gate series Slap gate series Steel dam pollution gate / cleaner rubber water stop
Contact Us
Name: Xinhe County Kaishu Machinery Co., Ltd. Address: East of Fuqiang Street, South of Binhe South Road, Xinhe County, Hebei Province Tel: 0319-4752220
Fax: 0319-4752228
Postcode: 055650
Contact: Geng Haojie Mobile: 13932903666
Website: bldware.com
Email: 951540666@qq.com
★ Win customer satisfaction with our service ★
★ Customer satisfaction is our eternal pursuit ★
Installation guide http://bldware.com

Gate installation precautions

1. Before installing the gate, first check whether the bolts at each connection part are loose due to transportation and loading and unloading, and tighten them if they are loose.

2. Check whether the water stop surface on the main frame and the horizontal frame are misaligned. If it is out of position, loosen the connecting bolts to adjust the water stop surface in the same plane.

3. When the gate is installed, it should be installed in place as a whole. It is forbidden to install the gate frame and the gate separately to prevent deformation of the gate frame.

4. Before the second-phase pouring, hoist the gate as a whole to find the correct position of the front, back, left and right, and then adjust the bolts and the engineering reinforcement to weld firmly.

5. Before the gate leaves the factory, in order to make the gate and the gate frame fit more tightly and reduce the gap after installation, the gate above 2 meters is installed with a plate clamp on the upper and lower horizontal frames, and the top of the vertical frame has added a top wire. Note that after the clearance adjustment, remove the top wire on the jamming iron and the inclined iron to open and close the gate.

6. When pouring concrete, the mortar flowing into the gap between the sluice plate, gate frame, inclined iron and baffle should be removed to prevent the solidification of the mortar from affecting the opening and closing.

Note for hoist installation

First, QL screw head hoist:

1. The foundation of the base should be firm and flat during installation, leaving the position of the foot screws. After the hoisting machine is in place, level the watering and molding.

2. The screw rod of the hoist must be parallel to the surface of the gate grinding track and perpendicular to the lifting lug axis. The two bases of the double lifting point must be on the same plane. The two screw rods are parallel and perpendicular to the lifting lug axis. Hand-cranked or powered hoist, start by hand-cranked up and down a few times, and can be used with power only after reaching the specifications; when operated with power, a descending depth controller is provided, but the operator must not leave the site without permission to prevent collisions due to circuit and other faults The accident happened.

Second, QPQ / QPK hoisting hoist:

1. The foundation of the base should be firm and flat during installation, leaving the position of the foot screws. After the hoisting machine is in place, level the watering and molding.

2. First, wind the steel wire rope on the balance wheel, and the two sides of the rope are evenly divided. The steel wire rope is wound up by moving the pulley group, and both ends are fixed at the end of the drum.

Main Hoist , Sewage Cleaner , Hoist Hoist , Tap Door , Screw Hoist , Rotary Cleaner , Steel Gate , Cast Iron Gate
Copyright: Xinhe County Kaishu Machinery Co., Ltd.
Phone: 13932903666
Record number: Hebei ICP No. 17015417-2
[Talk to me]
七乐彩 欢乐拼三张 欢乐拼三张 真人游戏平台注册